Case Study: Restoring the Bucky Fuller Geodesic Dome
A case study that details the restoration of the historic Buckminster Fuller geodesic dome using Carlisle's 60-mil Sure-Weld TPO adhered over 1/2" SecurShield HD Polyiso insulation.
English